PROJECT NAME:Brooktrails Township

Specific Plan Project

Environmental Impact Report

The following environmental mitigation measures were incorporated into an EIR for this project in order to reduce identified significant environmental impacts to a level of insignificance. A completed and signed report for each mitigation measure indicates that this mitigation measure has been complied with and implemented.

NO. MITIGATION MEASURE MONITORING
AGENCY
SHOWN
ON
PLANS
CONST./
INST.
REMARKS
3.1.2-1 Reconstruct Sherwood Rd. Township Begin planning
in 1997.
3.1.2-1 Reconfigure Sherwood Rd.
/Birch St. intersection
Township Plan and construct
in 1997.
3.1.2-1 Construct new southern access route Township Begin planning
in 1997.
3.1.2-1 Signalize Primrose Dr.
/Sherwood Rd.
Township Prior to buildout.
3.1.2-1 Upgrade Primrose Dr. Township Prior to buildout.
3.1.2-2 Implement Brooktrails
Evacuation Plan
Township (ongoing)
3.1.2-3 Enforce off-street parking regulations Township (ongoing)
3.1.3-1 Provide design review for new projects Township (ongoing)
3.1.5-1 Coordinate annual reviews with
Sheriff's Department
Township (annually)
3.1.5-3 Continue with Township recycling
program
Township (ongoing)
3.1.6-1 Provide archaeological monitoring of
Sherwood Rd. improvements
Township (design review)
3.1.6-2 Engage archaeologists to access finds
at project sites
Township (ongoing)
3.2.1-1 Require cut and fill analysis Township (ongoing)
3.2.1-2 Require erosion and sediment control plan Township (ongoing)
3.2.1-3 Require soil analysis Township (ongoing)
3.2.1-4 Require seismic analysis and design in
fault zone
Township (ongoing)
3.2.1-5 Conform to Calif. Uniform Building Code
Seismic Zone 4 standards as a minimum
Township (ongoing)
3.2.1-6 Keep EIR available for review Township (ongoing)
3.2.2-1 Prepare design criteria for cut slopes Township (ongoing)
3.2.3-1 Minimize tree and native vegetation
removal to the extent possible
Township (ongoing)
3.2.3-2 Conduct surveys for north coast
semaphore grass
Township (design review)
(ongoing)
3.2.3-3 Avoid tree removal during nesting
season
Township (design review)
(ongoing)
3.2.3-5 Remove unauthorized trails and install
new plantings
Township (ongoing)
3.2.3-6 Maintain open space wildlife corridor
linkages
Township (ongoing)
3.2.4-1 Control dust at construction sites Township (ongoing)
3.2.4-2 Utilize clean fuel burning fireplaces Township (design review)
(ongoing)
3.2.4-2 Implement Transportation Demand
Management measures
Township (ongoing)
3.2.5-1 Limit construction hours, muffle
construction equipment
Township (ongoing)
3.2.5-2 Install insulation Township (design review)
(ongoing)

EXPLANATION OF HEADINGS:

MONITORING AGENCY = Agency or entity responsible for monitoring a particular mitigation measure. Actual implementation may be through another agency such as Mendocino County for road improvements.

SHOWN ON PLANS = When mitigation measure is shown on plans, or required to be developed on plans with specifications, this column will be initialed and dated.

CONSTRUCTION/INSTALLED = When mitigation measure has been implemented, this column will be initialed and dated.
REMARKS = Area for describing status of ongoing mitigation measure or for other information.